Viridis Living has successfully obtained Gateway 2 approval for the initial two high-risk buildings (HRBs) within the Fallowfield Campus development at the University of Manchester. This landmark achievement is a significant step forward for the consortium, which includes Equitix, GRAHAM, and Derwent FM, as they aim to transform the campus into a modern and vibrant hub for students.
Project Details and Implications
The consortium has submitted a total of seven HRBs to the Building Safety Regulator, with the recent approvals granted for two buildings, each standing at 14 storeys and collectively offering over 400 student beds. This is particularly crucial in the context of the UK’s increasing demand for high-quality student accommodation, as universities seek to attract a diverse student population. With the Gateway 2 approval secured, construction on these two buildings is set to commence this month, further highlighting the urgency and importance of delivering safe and sustainable living environments for students.
Progress and Future Approvals
As the structural works are set to begin, the consortium anticipates receiving decisions from the Building Safety Regulator regarding the remaining five HRBs within the next two months. Neil McFarlane, GRAHAM’s project director for the Fallowfield Campus, remarked, “Securing Gateway 2 approval for the first two HRBs is a significant milestone for the Fallowfield Campus project and testament to the collaborative approach taken by the whole team.” This collaboration is vital in navigating the complexities of modern construction and compliance requirements, ensuring that the project adheres to the highest standards of safety and quality.
Expert Insights
Ben Leech, managing director of Investments at Equitix, expressed his enthusiasm for the project’s progress, stating, “We’re delighted that the Fallowfield Campus student accommodation project has reached this important stage. This is a key step forward for the University of Manchester in delivering modern, high-quality living spaces that ensure a safe, comfortable, and sustainable student experience for years to come.” The focus on sustainability not only meets current student expectations but also aligns with broader environmental goals in the PBSA sector.
In addition, Natalia Maximova, a partner at Sheppard Robson, emphasised the significance of teamwork in achieving the Gateway 2 approval. She noted, “The Gateway 2 approval for the first two high-risk residential blocks is a testament to successful teamwork and effective collaboration, which would not have been possible without early supply chain input and specialist expertise.” This reflects the increasing importance of collaborative efforts among stakeholders in the PBSA industry, particularly as projects become more complex and regulated.
Key design decisions, such as the adoption of a precast cross-wall system and extensive use of concrete, have enhanced the fire safety properties of the buildings while simplifying facade coordination. Such innovative approaches are essential in developing resilient structures that can withstand modern challenges.
As the project progresses, it’s clear that the Fallowfield Campus development is not only a significant investment in student accommodation but also a vital contribution to the overall landscape of the UK PBSA market. By prioritising safety, quality, and sustainability, the consortium sets a precedent for future developments in this sector.
