Cubex Gains Gateway 2 Approval for Temple Reach PBSA in Bristol

Rupert WallaceRupert Wallace
12 January 2026
3 min read

Share

Summarise with AI

Cubex has successfully secured Building Safety Act Gateway 2 approval for its notable purpose-built student accommodation (PBSA) project, Temple Reach, situated in Bristol’s Temple Quarter. This significant achievement allows the project to move forward into full construction, effectively minimising risks associated with delivery and regulatory compliance.

Project Overview and Impact

The Gateway 2 approval represents a pivotal milestone for the Temple Reach development, which is set to provide over 530 student homes. In addition to residential accommodation, the scheme will introduce new public spaces, affordable workspaces, and improved pedestrian connectivity in one of Bristol’s key regeneration areas. This strategic location is vital as it is just a two-minute stroll from the University of Bristol’s Temple Quarter Enterprise Campus and is adjacent to the developing Temple Island district, which is experiencing a constrained supply of student accommodation amidst growing demand.

Design and Sustainability Features

Temple Reach has been thoughtfully designed to ensure long-term income reliability through the provision of high-quality living spaces, ample shared amenities, and strong placemaking credentials. A newly established east-west pedestrian route through the site will facilitate better connectivity and increase foot traffic, complemented by an upscale public realm that includes boulevard gardens and rain gardens to enhance the living experience for residents and support the local environment. Moreover, the ground level will feature flexible commercial and affordable workspace options, diversifying the project’s income potential.

Architectural Vision

Architectural firm Corstorphine & Wright has crafted the design of Temple Reach to pay homage to Bristol’s Pennant stone and Byzantine architectural heritage, reinterpreting these elements in a modern and robust material palette that prioritises durability and operational efficiency. The project’s focus on sustainability is evident through features such as active flood mitigation, green infrastructure, and an energy-efficient building envelope, all aimed at lowering long-term operational costs and reducing carbon emissions.

Construction and Future Plans

The construction phase is being undertaken by Bowmer + Kirkland, which assures cost certainty and confidence in delivery. With the backing of Gateway 2 approval, the main construction activities are now poised to commence, with an anticipated completion date set for before the 2029 academic year. This timeline underscores the project’s commitment to addressing the pressing demand for quality student accommodation in the UK.

Investment Opportunities and Market Positioning

In the upcoming weeks, Cubex intends to engage with potential forward-funding investors and joint venture partners, seeking to align long-term institutional capital with the development of this high-quality PBSA asset located in a prime UK city. William Tomlinson, Development Director at Cubex, commented on this significant milestone, stating, “Securing Gateway 2 approval is a major achievement for Temple Reach and reflects the quality, rigour and collaboration behind the scheme. From the outset, our focus has been on delivering a safe, sustainable and well-considered building that contributes positively to Bristol’s evolving cityscape.”

Tomlinson further emphasised that Temple Reach aims to go beyond merely providing necessary student accommodation; it seeks to forge new connections, create high-quality public spaces, and embody the commitment to purposeful, sensitive, and integrity-driven development.

Temple Reach is an integral part of Cubex’s expanding portfolio, which encompasses residential, logistics, and mixed-use developments, all characterised by an ESG-led approach aimed at delivering institutional-grade assets that promise sustained value.